Serving Manesar Since 2020
EPC Services in Manesar
Manesar's Industrial Model Township (IMT) is a major industrial hub where we specialize in warehouse and manufacturing facility construction. Our cold storage facility here achieved ISO 22000 and HACCP certifications. We specialize in epc services withpricing from Rs 5,000,000-2,800,000,000 (project-based).
Starting Price
Rs 5,000,000
INR (project-based)
Premium Range
Rs 2,800,000,000
INR (project-based)
Warranty
10 Years
Structural
Why Choose Us for EPC Services in Manesar
1
Complete project management
2
Engineering design excellence
3
Strategic procurement optimization
4
Rigorous quality assurance
5
Risk mitigation strategies
Local Regulations in Manesar
We handle all regulatory compliance for construction in Manesar:
- HSIIDC (Haryana State Industrial and Infrastructure Development Corporation) approval
- IMT Manesar specific building guidelines
- Factory Act compliance for industrial units
- Pollution Control Board NOC
- Fire safety compliance for industrial facilities
Areas We Serve in Manesar
IMT Manesar Phase 1IMT Manesar Phase 2Manesar Industrial AreaSector 1-8 Manesar
Frequently Asked Questions
What is the minimum project size for your EPC services?
Our EPC services are available for projects starting from Rs 50 lakhs. For solar installations, we handle projects from 100 kW rooftop systems to 50 MW+ ground-mounted plants. For industrial and infrastructure projects, the minimum scope is typically determined by the complexity and engineering requirements rather than a strict cost threshold.
Do you offer fixed-price EPC contracts?
Yes, we offer fixed-price (lump-sum turnkey) EPC contracts after the detailed engineering phase is completed. This gives clients budget certainty with clearly defined scope, specifications, and deliverables. Any scope changes during execution are managed through a formal change order process with transparent cost implications.
What is the typical timeline for a solar power plant EPC project?
Solar plant timelines depend on capacity: 100 kW-1 MW rooftop systems take 2-4 months, 1-10 MW ground-mounted plants take 4-8 months, and 10-50 MW utility-scale plants take 8-14 months. Our 50 MW Jaisalmer project was completed in 10 months through parallel workstream execution.
Do you handle land acquisition and regulatory approvals for EPC projects?
We assist with land identification and due diligence, but land acquisition is typically the client's responsibility. For regulatory approvals, we handle all construction-related permits, environmental clearances, grid interconnection approvals (for solar), and safety certifications. Our regulatory team has extensive experience navigating approval processes across multiple states.
What types of industrial facilities do you build in Manesar?
We specialize in PEB warehouses, cold storage facilities, manufacturing plants, and food processing units in IMT Manesar.
Do you handle HSIIDC approvals?
Yes, our team manages all HSIIDC-related permits and approvals for industrial construction in Manesar.
Ready to Start Your EPC Services Project in Manesar?
Get a free site assessment and detailed quote within 24 hours. No obligation.
Get Free Quote Now