EPC
Megawatt Solar Power Plant
50 MW ground-mounted solar power plant with advanced single-axis tracking systems and grid integration. Delivers clean energy to 25,000 households with 98% efficient inverters, SCADA-based monitoring, 25-year performance warranty, and comprehensive power evacuation infrastructure. Delivered with Xrossways, the Good Value Solutions solar arm (xrossways.com).
Location
Jaisalmer, Rajasthan
Client
State Power Corporation
Year
2023
Case Study
Client industry: Government & Energy
Challenge
The State Power Corporation required a 50 MW ground-mounted solar power plant on 200 acres of arid land in Jaisalmer, Rajasthan, with grid integration, single-axis tracking systems, and a 10-month delivery window to meet power purchase agreement (PPA) deadlines. The remote desert location posed logistical challenges for material transport and worker accommodation.
Solution
We established a temporary construction camp near the project site with accommodation for 500 workers and set up a dedicated material staging area to manage logistics. Engineering designed the mounting structures and tracking systems to withstand Rajasthan's high wind speeds and sand abrasion. We procured 150,000 solar panels, 100 string inverters, and 25,000 mounting structures through our vendor network, optimizing delivery schedules to match installation sequences. A parallel workstream approach — simultaneous foundation casting, structure erection, and panel mounting across multiple blocks — compressed the overall timeline.
Results
Completed and commissioned in 10 months with Xrossways, the Good Value Solutions solar arm, meeting the PPA deadline. The plant generates clean energy for 25,000 households with 98% inverter efficiency and SCADA-based monitoring providing real-time performance data. The single-axis tracking system increases energy yield by 20-25% compared to fixed-tilt installations. The ₹280 crore project was delivered within budget, with 500 workers managed safely in challenging desert conditions with zero lost-time incidents. The plant comes with a 25-year performance warranty.