Warehousing
Advanced Logistics & Distribution Center
State-of-the-art 250,000 sq ft temperature-controlled warehousing facility with automated storage and retrieval systems. Features multi-level racking, advanced inventory management, and sustainable energy solutions including 500kW solar capacity and LEED Gold certification.
Location
Sector 37, Gurgaon
Client
Confidential Logistics Group
Year
2024
Case Study
Client industry: Logistics & Supply Chain
Challenge
A leading logistics group required a 250,000 sq ft temperature-controlled facility with automated storage and retrieval systems, strict LEED Gold sustainability targets, and an 18-month delivery deadline in Sector 37, Gurgaon.
Solution
We deployed a phased construction approach with parallel workstreams: foundation and structural steel erection ran simultaneously with procurement of specialized HVAC and automation equipment. Our engineering team designed a multi-level racking system optimized for the client's SKU profiles while integrating 500 kW of rooftop solar capacity.
Results
Delivered ahead of schedule with LEED Gold certification achieved on first submission. The facility's automated systems reduced operational costs by 30%, and the solar installation covers 40% of the warehouse's energy needs. 450 workers were safely managed with zero lost-time incidents across the 18-month build.
Project Statistics
Total Area
0
sq ft
Duration
0
months
Budget
₹0
Project Value
Workforce
0
Workers
Materials Used
Project Gallery
3 images
Project Timeline
Site Preparation & Foundation
CompletedSite clearing, excavation, and foundation work for the main structure
Structural Construction
CompletedSteel framework erection and wall construction
Systems Integration
CompletedHVAC, electrical, and automation systems installation
Finishing & Handover
CompletedFinal touches, inspection, and client handover